Search
Yorkshire Water
Hi, I'm Sidra
Ask me a question

Contact Us

New Water Connections
0845 1 20 84 82

Yorkshire Water
PO Box 52
Bradford
BD3 7YD

Email us

 

Where you are:
Home / Extra services / Developer services / New water connections / Apply for a water connection

Apply for a water connection to aApply for a water connection

new property or development

You need to complete one of the application forms below and send it to us with the supporting information and application fee. 

 

Complete the joint supply application for connecting a new supply to a property already with a water supply but on a joint supply with a neighbour or other domestic property.


Download joint supply application form  (104kb)

Complete the 6 domestic supplies application for connecting up to 6 domestic properties (houses or flats) or to a field for animal welfare.


Download application form for up to 6 domestic supplies (189kb)

Complete the connection to a housing development and a contaminated land assessment form for a housing development site (more than 6 houses or flats).


Download application form for connection to a housing development (191kb)

Complete the connection to a commercial development and a contaminated land assessment form for connection to a commercial site or a building being used for non standard housing (student accommodation, nursing homes, and sheltered housing). 


Download application for a connection to a commercial or mixed development (622kb)

Complete a contaminated land assesement form along with the form for a connection to a housing development and for a connection to a commercial or mixed use development.


Download contaminated land assessment form (46kb)

Complete the development enquiry request form if you require information regarding our ability to supply water to a proposed development.


Download development enquiry request form (179kb)


Download and complete this form if you require a disconnection form

What happens next?
Once we've received your application, we'll arrange for a surveyor to visit your development to assess the work required and we'll then send a quote within 28 days.

 

If you're unsure which form to use call us on 0845 1 20 84 82

 

You need to be either the owner of the land or buildings being developed to apply.

Self laying of water mains and services

If you're a developer and want to lay your water mains and services on site our self lay policy (PDF Document 198kb) explains our requirements for construction and what accreditation your contractor needs to undertake this work.